IMPLEMENTASI METODE 5S PADA LEAN SIX SIGMA DALAM PROSES PEMBUATAN MUR BAUT VERSING (Studi Kasus di CV. Desra Teknik Padang)

Authors

  • Adriansyah Adriansyah Alumnus Fakultas Teknologi Industri, Jurusan Teknik Industri, Universitas Bung Hatta, Padang
  • Yesmizarti Muchtiar Fakultas Teknologi Industri, Jurusan Teknik Industri, Universitas Bung Hatta Padang
  • Noviyarsi Noviyarsi Fakultas Teknologi Industri, Jurusan Teknik Industri, Universitas Bung Hatta Padang

:

https://doi.org/10.9744/jti.9.1.63-74

Keywords:

5S, six sigma, lean sigma.

Abstract

The objective of this research was to minimize processing time in manufacturing using 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) method. As well as quality, processing time is one of the important points to consider. Improvement had been done in every step of the process to achieve 3.4 defect per million (DPM). Although 6s had not been achieved yet, but 5S method in Lean Sigma have already improved the production process Abstract in Bahasa Indonesia : Penelitian ini bertujuan untuk memperlihatkan penggunaan Metoda 5S (Seiri, Seiton, Seiso, Seiketsu, Shitsuke) dalam meminimalkan waktu proses pembuatan produk. Selain kualitas produk, waktu proses merupakan hal yang penting untuk diperhatikan. Perbaikan dari setiap proses dilakukan agar didapat 3,4 kegagalan persejuta (DPM). Walaupun 6s belum tercapai, tapi penerapan metoda 5S dalam Lean Sigma sudah menunjukkan perbaikan pada proses yang dilakukan. Kata kunci: 5S, six sigma, lean sigma

Downloads

Published

2007-07-04

How to Cite

[1]
A. Adriansyah, Y. Muchtiar, and N. Noviyarsi, “IMPLEMENTASI METODE 5S PADA LEAN SIX SIGMA DALAM PROSES PEMBUATAN MUR BAUT VERSING (Studi Kasus di CV. Desra Teknik Padang)”, Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, vol. 9, no. 1, pp. 63-74, Jul. 2007.

Issue

Section

Articles