Hidayat, N. P., A. Cakravastia, T. A. Samadhi, and A. H. Halim. “Multi-Items Batch Scheduling Model for a Batch Processor to Minimize Total Actual Flow Time of Parts through the Shop”. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri, vol. 20, no. 1, July 2018, pp. 73-88, doi:10.9744/jti.20.1.73-88.