Widyadana, I Gede Agus. “COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS”. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri, vol. 3, no. 1, July 2004, pp. 9-17, doi:10.9744/jti.3.1.9-17.