“ROBUST-HYBRID GENETIC ALGORITHM FOR A FLOW-SHOP SCHEDULING PROBLEM (A Case Study at PT FSCM Manufacturing Indonesia)”. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri, vol. 9, no. 2, Jan. 2008, pp. 144-51, https://doi.org/10.9744/jti.9.2.144-151.