[1]
“Model Penjadwalan Batch Multi Item dengan Dependent Processing Time”, J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind., vol. 12, no. 2, pp. 69–80, Dec. 2010, doi: 10.9744/jti.12.2.69-80.