[1]
“MODEL PENJADWALAN PADA FLOWSHOP-4-STAGE DENGAN KRITERIA MINIMISASI LATENESS MAKSIMUM DAN JUMLAH TARDY JOBS”, J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind., vol. 11, no. 2, pp. 148–162, Dec. 2009, doi: 10.9744/jti.11.2.148-162.