[1]
“MULTI OBJECTIVE MODEL FOR BALANCING U-TYPE ASSEMBLY LINE WITH PERMANENT AND TEMPORARY WORKERS”, J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind., vol. 11, no. 1, pp. 33–42, Jun. 2009, doi: 10.9744/jti.11.1.33-42.