[1]
“PERANCANGAN DAN IMPLEMENTASI SISTEM PENGUKURAN KINERJA DENGAN METODE INTEGRATED PERFORMANCE MEASUREMENT SYSTEMS (Studi Kasus: Jurusan Teknik Mesin Universitas Mataram)”, J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind., vol. 9, no. 2, pp. 131–143, Jan. 2008, doi: 10.9744/jti.9.2.131-143.