[1]
“COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS”, J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind., vol. 3, no. 1, pp. 9–17, Jul. 2004, doi: 10.9744/jti.3.1.9-17.