Yusriski, R., Nasution, A. R. K., Lukas, L., Wijayanti, L. . and Octaviani, S. . (2023) “A Two-Machine Flow Shop Batch Scheduling Model to Minimize Total Actual Flow Time”, Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, 25(2), pp. 179-194. doi: 10.9744/jti.25.2.179-194.