Hidayat, N. P., Cakravastia, A., Samadhi, T. A. and Halim, A. H. (2018) “Multi-items Batch Scheduling Model for a Batch Processor to Minimize Total Actual Flow Time of Parts through the Shop”, Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, 20(1), pp. 73-88. doi: 10.9744/jti.20.1.73-88.