Widyadana, I. G. A. (2004) “COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS”, Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, 3(1), pp. 9-17. doi: 10.9744/jti.3.1.9-17.