“ROBUST-HYBRID GENETIC ALGORITHM FOR A FLOW-SHOP SCHEDULING PROBLEM (A Case Study at PT FSCM Manufacturing Indonesia)” (2008) Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, 9(2), pp. 144–151. doi:10.9744/jti.9.2.144-151.