“A MODIFIED GIFFLER AND THOMPSON ALGORITHM COMBINED WITH DYNAMIC SLACK TIME FOR SOLVING DYNAMIC SCHEDULE PROBLEMS” (2004) Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, 5(2), pp. 71–80. doi:10.9744/jti.5.2.71-80.