“COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS” (2004) Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, 3(1), pp. 9–17. doi:10.9744/jti.3.1.9-17.