Yusriski, Rinto, Andri Rachmat Kumalasian Nasution, Lukas Lukas, Linda Wijayanti, and Sandra Octaviani. 2023. “A Two-Machine Flow Shop Batch Scheduling Model to Minimize Total Actual Flow Time”. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri 25 (2):179-94. https://doi.org/10.9744/jti.25.2.179-194.