Soewanda, Johan, Tanti Octavia, and Iwan Halim Sahputra. 2008. “ROBUST-HYBRID GENETIC ALGORITHM FOR A FLOW-SHOP SCHEDULING PROBLEM (A Case Study at PT FSCM Manufacturing Indonesia)”. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri 9 (2):144-51. https://doi.org/10.9744/jti.9.2.144-151.