Widyadana, I Gede Agus. 2004. “COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS”. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri 3 (1):9-17. https://doi.org/10.9744/jti.3.1.9-17.