“ROBUST-HYBRID GENETIC ALGORITHM FOR A FLOW-SHOP SCHEDULING PROBLEM (A Case Study at PT FSCM Manufacturing Indonesia)”. 2008. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri 9 (2): 144-51. https://doi.org/10.9744/jti.9.2.144-151.