HIDAYAT, N. P.; CAKRAVASTIA, A.; SAMADHI, T. A.; HALIM, A. H. Multi-items Batch Scheduling Model for a Batch Processor to Minimize Total Actual Flow Time of Parts through the Shop. Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, [S. l.], v. 20, n. 1, p. 73-88, 2018. DOI: 10.9744/jti.20.1.73-88. Disponível em: https://jurnalindustri.petra.ac.id/index.php/ind/article/view/20592. Acesso em: 28 apr. 2024.