YUSRISKI, Rinto; NASUTION, Andri Rachmat Kumalasian; LUKAS, Lukas; WIJAYANTI, Linda; OCTAVIANI, Sandra. A Two-Machine Flow Shop Batch Scheduling Model to Minimize Total Actual Flow Time. Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, [S. l.], v. 25, n. 2, p. 179–194, 2023. DOI: 10.9744/jti.25.2.179-194. Disponível em: https://jurnalindustri.petra.ac.id/index.php/ind/article/view/27307. Acesso em: 4 oct. 2025.