Yusriski, R., Nasution, A. R. K., Lukas, L., Wijayanti, L. ., & Octaviani, S. . (2023). A Two-Machine Flow Shop Batch Scheduling Model to Minimize Total Actual Flow Time. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri, 25(2), 179-194. https://doi.org/10.9744/jti.25.2.179-194