Widyadana, I. G. A. (2004). COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS. Jurnal Teknik Industri: Jurnal Keilmuan Dan Aplikasi Teknik Industri, 3(1), 9–17. https://doi.org/10.9744/jti.3.1.9-17