(1)
MODEL PENJADWALAN PADA FLOWSHOP-4-STAGE DENGAN KRITERIA MINIMISASI LATENESS MAKSIMUM DAN JUMLAH TARDY JOBS. J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind. 2009, 11 (2), 148-162. https://doi.org/10.9744/jti.11.2.148-162.