(1)
ROBUST-HYBRID GENETIC ALGORITHM FOR A FLOW-SHOP SCHEDULING PROBLEM (A Case Study at PT FSCM Manufacturing Indonesia). J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind. 2008, 9 (2), 144-151. https://doi.org/10.9744/jti.9.2.144-151.