(1)
PENJADWALAN PRODUKSI FLEXIBLE FLOWSHOPS DENGAN SEQUENCE-DEPENDENT SETUP TIMES MENGGUNAKAN METODE RELAKSASI LAGRANGIAN (Studi Kasus Pada PT. Cahaya Angkasa Abadi). J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind. 2004, 5 (2), 111-119. https://doi.org/10.9744/jti.5.2.111-119.