(1)
COMPARISON BETWEEN MIXED INTEGER PROGRAMMING WITH HEURISTIC METHOD FOR JOB SHOP SCHEDULING WITH SEPARABLE SEQUENCE-DEPENDENT SETUPS. J. Tek. Ind. J. Keilmuan dan Apl. Tek. Ind. 2004, 3 (1), 9-17. https://doi.org/10.9744/jti.3.1.9-17.