[1]
Yusriski, R., Nasution, A.R.K., Lukas, L., Wijayanti, L. and Octaviani, S. 2023. A Two-Machine Flow Shop Batch Scheduling Model to Minimize Total Actual Flow Time. Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri. 25, 2 (Dec. 2023), 179-194. DOI:https://doi.org/10.9744/jti.25.2.179-194.