[1]
Octavia, T. 2004. A MODIFIED GIFFLER AND THOMPSON ALGORITHM COMBINED WITH DYNAMIC SLACK TIME FOR SOLVING DYNAMIC SCHEDULE PROBLEMS. Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri. 5, 2 (Jul. 2004), 71-80. DOI:https://doi.org/10.9744/jti.5.2.71-80.