[1]
Hidayat, N.P. et al. 2018. Multi-items Batch Scheduling Model for a Batch Processor to Minimize Total Actual Flow Time of Parts through the Shop. Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri. 20, 1 (Jul. 2018), 73–88. DOI:https://doi.org/10.9744/jti.20.1.73-88.