[1]
Soewanda, J. et al. 2008. ROBUST-HYBRID GENETIC ALGORITHM FOR A FLOW-SHOP SCHEDULING PROBLEM (A Case Study at PT FSCM Manufacturing Indonesia). Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri. 9, 2 (Jan. 2008), 144–151. DOI:https://doi.org/10.9744/jti.9.2.144-151.