Analisis Efektifitas Mesin/Alat Pabrik Gula Menggunakan Metode Overall Equipments Effectiveness

Authors

  • Subiyanto Subiyanto Pusat Audit Teknologi, Badan Pengkajian dan Penerapan Teknologi. Puspiptek - Serpong, Tangerang Selatan

:

https://doi.org/10.9744/jti.16.1.43-52

Keywords:

Overall Equipment Effectiveness (OEE), revitalization of sugar industry, state owned sugar factory.

Abstract

The national sugar production capability especially of the state owned sugar factory tends to decrease while demand increases.   To overcome the problem, government has issued the presidential Decree No. 5/2010 and declared a revitalization program of sugar industry as a priority development program. The Ministry of Industry has implemented the program by restructuring the sugar factory's machinery/equipments.  Since there are many of factories (51 units) and the budget is limited, the ministry should be selective as to which factories need to be restructered, and therefore the program shoud be supported by prior information about the machinery efficiency status of each factory. To provide those information,  this study applies the application of the Overall Equipment Effectiveness (OEE) method on 39 state owned sugar factories.  The results indicate that the everage rate of OEE for the 39 sugar factories for the year of 2010 to 2012 is 61.28% (best practice: 77.4%), while Availability, Performance, and Quality is 86.43%, 91.39%, and 77.02% respectively. The study also identifies 19 worst factories in efficiency, and therefore recommends those factories as priority to be restructured.

References

Bhagat, J. J., National Plan for Improving Efficiency in Indonesian Sugar Industry-Field & Factory, STM Projects Limited, New Delhi. India, 2012.

Braglia, M., Frosolini, M. and Zammori, F., Overall Equipment Effectiveness of a Manufacturing Line (OEEML): An Integrated Approach to Assess Systems performance, Journal of Manufacturing Technology Management, 20(1), 2009, pp. 8-29

Dal, B., Tugwell, P., and Greatbanks, R., Overall Equipment Effectiveness as a Measure of Opera¬tional Improvement – A Practical Analysis, International Journal of Operations & Production Management, 20 (12), 2000, pp. 1488-502

Ditjen Perkebunan Kementerian Pertanian, Buku Statistik Perkebunan Tahun 2008-2012. (www.deptan.go.id; last update 10 Februari 2014).

EXOR/DataVisor Marquees, The Complete Guide to Simple OEE: Overall Equipment Effectiveness (OEE), Cincinnati, Ohio, E-document, Downloaded: January 13, 2014. (www.exor-rd.com).

Fitriadi, R. dan Kuncoro, B. G. Analisa Perbaikan Mesin CNC MA-1 dengan Menggunakan Indikator Kinerja Overall Equipment Effectiveness (OEE). Prosiding SNST ke-4 Tahun 2013 Fakultas Teknik Universitas Wahid Hasyim Semarang, 2013.

Huang, S. H., Dismukes, J. P, Mousalam, A., Razzak, R. B., and Robinson, D. E, Manufacturing Productivity Improvement Using Effectiveness Metrics and Simulation Analysis, International Journal of Production Research, 41(3), 2003, pp.513-527.

Kementerian BUMN, Data Produksi PTPN & RNI 2010 - 2014. Bahan Presentasi, 2013.

Kementerian Perindustrian, Laporan Kinerja Produksi Pabrik Gula. Program Revitalisasi Industri Gula Melalui Restrukturisasi Mesin dan/atau Peralatan Pabrik Gula. Kerjasama dengan Surveyor Indonesia, 2013.

Kementerian Perindustrian, Pelaksanaan Program Revitalisasi Industri Gula 2010-2014. Bahan Presentasi, 2013.

Kepres nomor 57 tahun 2004 tentang Penetapan Gula Sebagai Barang Dalam Pengawasan.

Mulyati, D., Analisis Efektivitas Peralatan Produksi Pada PT. Bahari Dwikencana Lestari Kabupaten Aceh Tamiang, Jurusan Teknik Manajemen Industri, Fakultas Teknik Universitas Serambi Mekkah, Banda Aceh, 2012.

Nakajima, S., Introduction to TPM, Productivity Press, Cambridge, MA., 1988.

Neraca, 03/12/2013, Pemerintah Langgar 8 Kebijakan Pergulaan Nasional, (http://www.neraca. co.id)

Nachiappan, R.M. and Anantharam, N., Evaluation of Overall Line Effectiveness (OLE) in a Continuous Product Line Manufacturing System, Journal of Manufacturing Technology Management, 17(7), 2006, pp. 987-1008.

Oechser R., Pfeffer M., Pftzner L., Binder H., Muller E., Vonderstrass T., From Overall Equipment Effectiveness to Overall Fab Effectivenes s (OFE), Material Science in Semiconductor Processing, Vol 5, Issue 4-5, 2003, pp 333-339.

Peraturan Presiden No. 5 Tahun 2010 tentang Rencana Pembangunan Jangka Menengah Nasional (RPJMN).

Peraturan Menteri Perdagangan Nomor 18/M-DAG/PER/4/2007 tentang Ketentuan Impor Gula.

PTPN X, Angka-angka Pengawasan Pabrik Gula. Bahan Inhouse Training Mandor-mandor. Tretes, 11-14 Januari 2011.

Pusat Data dan Sistem Informasi Pertanian, Kementerian Pertanian, Kinerja Perdagangan Komoditas Pertanian, 4(1), 2013, hal. 85-103.

Rahmad, Pratikto, dan Slamet Wahyudi, Penerapan Overall Equipment Effectiveness (OEE) Dalam Implementasi Total Productive Maintenance (TPM) (Studi Kasus di Pabrik Gula PT “Y”). Jurnal Rekayasa Mesin, 3(3), 2012, hal 431-437.

Robinson dan Ginder, Implementing TPM: The North American Experience. Productivity Press, Portland, USA. (eBook), 1995.

Sewoko, C., Kebijakan Revitalisasi Industri Gula Nasional, Bahan Forum Group Discusion di Badan Pengkajian dan Penerapan Teknologi (BPPT) Jakarta, 19 Oktober 2010, Asosiasi Gula Indonesia, 2012.

Sherwin, David, A review of overall models for maintenance management, Journal of Quality in Maintenance Engineering, Vol. 6 No. 3, 2000, pp. 138-164.

Subiyono, Succes Story PTPN X Tahun 2011, Bahan Konggres IKAGI Februri 2012 di Surabaya, 2012.

Wauters, F., and Mathot,J., Overall Equipment Effectiveness, A whitepaper, 2002, (http://www05. abb.com/global).

Williamson, R. M., Using Overall Equipment Effectiveness: The Metric and the Measures, Stra-tegic Work Systems, Inc, Columbus, 2006. Available online at: (http://www.swspitcrew. com).

Downloads

Published

2014-05-01

How to Cite

[1]
S. Subiyanto, “Analisis Efektifitas Mesin/Alat Pabrik Gula Menggunakan Metode Overall Equipments Effectiveness”, Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, vol. 16, no. 1, pp. 43-52, May 2014.

Issue

Section

Articles