Vol 5, No 1 (2003)

JUNE 2003

Table of Contents

Articles

DYNAMIC ABC STORAGE POLICY IN ERRATIC DEMAND ENVIRONMENTS PDF
Benjamin Pierre, Bart Vannieuwenhuyse, Denis Dominanta, Hendrik Van Dessel pp. 1-12
PROCUREMENT IN MANUFACTURING ORGANISATION: PORTFOLIO AND THE USE OF THE INTERNET PDF
I Nyoman Pujawan pp. 13-21
SYSTEM DESIGN AND BEHAVIOR OF PATTERN RECOGNITION OF CONTROL CHART USING NEURAL NETWORK PDF
Justin Yulius Halim pp. 22-31
CASE STUDIES OF USE OF DESIGN OF EXPERIMENTS IN MATERIAL RESEARCH PDF
Salil Kumar Roy, I Nyoman Sutapa pp. 32-40
MODEL OPTIMASI PENJADWALAN PRODUKSI YANG TERINTEGRASI DENGAN MEMPERTIMBANGKAN FAKTOR BIAYA PDF
Dian Retno Sari Dewi pp. 41-49
APLIKASI ANALYTIC NETWORK PROCESS (ANP) PADA PERANCANGAN SISTEM PENGUKURAN KINERJA (Studi Kasus pada PT. X) PDF
Iwan Vanany pp. 50-62
PENINGKATAN EFEKTIFITAS DAN EFISIENSI BIAYA KUALITAS MELALUI PENEDEKATAN SIMULASI (Studi Kasus di CV. SINAR BAJA ELEKTRIC) PDF
I Gede Agus Widyadana, Elsie Elsie pp. 63-70