Scheduling Flexible Manufacturing System with Stacker Crane Using Coloured Petri Nets

Authors

  • Ari Setiawan Department of Industrial Engineering Institut Teknologi Harapan Bangsa
  • Teguh Ersada Natail Sitepu Institut Teknologi Harapan Bangsa

:

https://doi.org/10.9744/jti.20.2.113-126

Keywords:

scheduling, Flexible Manufacturing System, Coloured Petri Nets, stacker crane, simulation.

Abstract

Scheduling Flexible Manufacturing System (FMS) can increase production speed and accuracy. It because FMS has an ability to process various variety of product at same work station. However, FMS need efficient allocation of resources, for example: allocation of material handling equipment. This paper presents production scheduling FMS modelling to 24 jobs and 4 machines considering stacker crane. Coloured Petri Nets (CP-Nets) is the programming language which used to simulate model because it’s simplicity. This model consists two main model activities. The first one is Physical Activity (PA) which related to every activity that involve physical movement, including stacker crane processes. PA consist five CP-Nets models: loading/unloading station, stacker crane, machine, picking mechanism, and pallet stocker. The second activity is Logical Expression (LE) which related to the rules on how FMS should operate. LE consist three CP-Nets models: machine selection, pick-up request, and stage two procedure.  A simulation and numerical report show utilization level of all machines around 80-84% and stacker crane 8,74%. 

References

Setiawan, A., Qashmal L., Wangsaputra, R., Martawirya, Y. Y., Halim, A. H. 2016. An object-oriented Modelling of Production Scheduling for Flexible Manufacturing System. Bandung: Institut Teknologi Bandung.

Jensen, K., Kristensen, L.M. 2009. Coloured Petri Nets: Modelling and Validation of Concurrent Systems. Denmark: Springer-Verlag Berlin Heidelberg.

Kusuma, A.C. 2016. Penjadwalan Job Dua Stage Pada Flexible Manufacturing System menggunakan Metode Genetic Algorithm. Bandung: Institut Teknologi Harapan Bangsa.

Surya, T. 2016. Penjadwalan Job Dua Stage Pada Flexible Manufacturing System Menggunakan Metode Ant Colony Optimization. Bandung: Institut Teknologi Harapan Bangsa.

Suhendi, A. 2017. Penjadwalan Job Dua Stage Pada Flexible Manufacturing System Menggunakan Metode Ant Colony Optimization Dengan Faktor Umur Cutting Tools. Bandung: Institut Teknologi Harapan Bangsa.

Kurniawan, R. 2017. Pendekatan Object-Oriented Modelling Untuk Penjadwalan Produksi Yang Memperhatikan Cutting Tools Lifetime Pada Flexible Manufacturing System. Bandung: Institut Teknologi Harapan Bangsa.

Shivanand, H.K., Benal, M. M., Koti, V. 2006. Flexible Manufacturing System. New Delhi: New Age International (P) Limited, Publishers.

Dicesare, F., Harhalakis, G., Proth, J.-M., Silva-Suarez, M., Vernadat, F. 1993. Practice of Petri Nets in Manufacturing. Netherlands: Springer.

Conway, Richard W. 1967. Theory of Scheduling. Massachusett: Addison Wesley Publishing Co.

Baker, K.R. 1974. Introduction To Sequencing and Scheduling. New York: John Wiley and Sons.

Biegel, J.E. 1992. Production Control. New York: Prentice-Hall. Inc.

Vollman, T. E., Whybark, Lee B.W. 1998. Manufacturing Planning & Control System, 4th Edition. McGraw-Hill Trade.

Narshimhan, S.L., McLeavey, D.W., Billington, P.J. 1985. Production Planning and Inventory Control, 2nd Edition. Prentice-Hall International.

Bedworth, David D., Bailey, James Edward. 1987. Integrated Production Control System Management, Analysis, and Designs. Singapore: John Wiley and Sons.

Ullman, J. D. 1993. Elements of ML Programming. Prentice-Hall

Downloads

Published

2019-01-12

How to Cite

[1]
A. Setiawan and T. E. N. Sitepu, “Scheduling Flexible Manufacturing System with Stacker Crane Using Coloured Petri Nets”, Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, vol. 20, no. 2, pp. 113-126, Jan. 2019.