MULTI OBJECTIVE MODEL FOR BALANCING U-TYPE ASSEMBLY LINE WITH PERMANENT AND TEMPORARY WORKERS

Authors

  • Gede Agus Widyadana Department of Industrial and System Engineering, Chung Yuan Christian University

:

https://doi.org/10.9744/jti.11.1.33-42

Keywords:

line balancing, U-type line, permanent and temporary workers, goal programming

Abstract

Assembly line balancing is one of the most important management decisions for reducing production costs. So far, many researches have been done in this area. In this research, we expand the U-type line-balancing using goal programming for multi objective model with two goals, i.e., minimized the number of temporary workers and number of cycle time in each station. Additionally, an example to illustrate the model, as well as some analyses is presented. Different amount of time for temporary worker to accomplish their tasks were generated. For some cases, the U-type assembly line is more efficient than the straight one. However, the goal 1 and goal 2 are conflicted

Downloads

Published

2009-06-08

How to Cite

[1]
G. A. Widyadana, “MULTI OBJECTIVE MODEL FOR BALANCING U-TYPE ASSEMBLY LINE WITH PERMANENT AND TEMPORARY WORKERS”, Jurnal Teknik Industri: Jurnal Keilmuan dan Aplikasi Teknik Industri, vol. 11, no. 1, pp. 33-42, Jun. 2009.

Issue

Section

Articles